• boonhet@sopuli.xyz
    link
    fedilink
    English
    arrow-up
    9
    ·
    23 hours ago

    The one he was planning was going to use 9 gigawatts of electricity at peak load.

    My entire country, a million and change population, has never used more than about 1.6 gigawatts. That includes our multiple NON-AI data centers.